Power System Operation Corporation Ltd.(POSOCO) Recruitment of Executive Trainees for Electrical,Computer Science


Power System Operation Corporation Limited (POSOCO) was a wholly owned subsidiary of Power Grid Corporation of India Limited (PGCIL) till 2 January 2017. It was formed in March 2010 to handle the power management functions of PGCIL. It is responsible to ensure the integrated operation of the Grid in a reliable,efficient and secure manner. It consists of 5 Regional Load Despatch Centres and a National Load Despatch Centre (NLDC). The subsidiary was eventually made a separate company, leaving the parent firm with only the task of setting up transmission links. The load despatch functions, earlier handled by PGCIL, will now come up to POSOCO. Now POSOCO is fully govt. Company because on 3 January 2017 it was separated from powergrid.



Central Government through Ministry of Power in exercise of the power conferred by sub-section (3) of Sect 26 and sub-section (2) of Section 27 of the Electricity Act, 2003, by notification dt. 27 September 2010 in the Gazette of India notified that the Power System Operation Corporation Ltd (POSOCO), a wholly owned subsidiary of the Power Grid Corporation of India Limited (a Government Company) shall operate National Load Despatch Centre and the five Regional Load Despatch Centers, with effect from 1 October 2010.





The subsidiary was set up on the recommendations of a government committee headed by G.B. Pradhan, additional secretary in the Union ministry of power. To make load despatch centres financially self-reliant and autonomous, the committee recommended independent and sustainable revenue streams. The move to separate the two functions is in keeping with the provisions of the Electricity Act, 2003, which seeks to separate commercial interests from load management functions. The Pradhan committee had recommended setting up a separate representative board structure overseeing the functions of the five regional load despatch centres (RLDCs) run by PGCIL—the northern, eastern, north-eastern, western and southern regions at that time.(Information courtesy wikipedia)



Power System Operation Corporation Ltd.(POSOCO) Recruitment of Executive Trainees  

Name of Posts

ET(Electrical) 45 posts

ET(Computer Science) 19 post 

Qualifications:

ELIGIBILITY CRITERIA: Valid Score in the GATE 2018. Candidate should have valid score in the corresponding paper of GATE 2018 as shown in the following table and Qualified in the same. The qualifying marks are as declared by GATE 2018 Organizing Body. For details on Qualifying marks for all categories, please visit GATE Website. 2. Essential Qualification : ET (Electrical) & ET (Computer Science)



i. Course: Full Time B.E./ B.Tech/ B.Sc (Engg.) from recognized University/ Institute; 

ii. Discipline: Electrical: Electrical/ Electrical (Power)/ Electrical and Electronics/ Power Systems Engineering/ Power Engineering (Electrical) ; Computer Science: Computer Science/ Computer Engg./ Information Technology

 Last Date : 27/06/2018

 More informations and official notification,Please click link below:
https://posoco.in/IA/rectdoc/CC_ET%28Electrical%29_ET%28CS%29_Detailed_Advert.pdf