Namma Metro, also known as Bangalore Metro is a metro system serving the city of Bangalore, India. It is currently the second longest operational metro network in India after the Delhi Metro.On the other hand, Namma Metro was ranked the 83rd largest metro system in terms of length and the 79th largest metro network in terms of number of operating stations in the world. It also contains the first underground metro line in South India.
The metro network consists of two colour-coded lines, with a total
length of 42.3 kilometres serving 41 stations. The system has a mix of
underground, at-grade, and elevated stations using standard-gauge
tracks. The metro has an average daily ridership of 315,000 passengers.
By 2021, the system is expected to complete its phase 2 network and
provide connectivity to the city's important tech hubs of Electronics City and White Field
The Bengaluru Metro Rail Corporation Ltd (BMRCL), a joint venture of the Government of India and the Government of Karnataka, built and operates the Namma Metro.Services operate daily between 05:00 and 23:00 running with a headway varying between 4–20 minutes. The trains are composed of three cars. The power output is supplied by 750 volt direct current through third rail. Namma Metro was the second rail transport system in India to use 750V DC third rail traction, the first being the Kolkata Metro.
BMRCL RECRUITMENT
Name of Post : Assistant Engineer (68 Posts)
Qualification : BE/ B.Tech in Civil Engineering or Diploma in Civil Engineering with 5- 8 years Experience.
Salary : Rs. 48,280/- Per Month
Location : Bangalore
Last date :
31/08/2018
Name of Post : Assistant Executive Engineer ( 31 Posts)
Qualification: BE/ B.Tech in Civil Engineering with 8 -10 years experience
Salary : Rs. 55,860/- Per Month
Location : Bangalore
Last date :
31/08/2018
More details and official notification, Please click link below:
http://english.bmrc.co.in/FileUploads/17ccba_CareerFiles.pdf