Showing posts with label railway jobs. Show all posts
Showing posts with label railway jobs. Show all posts

Konkan Railway Recruitment 2018 for 100 Group D posts



Konkan Railway Corporation Limited (KRCL) is a Union Government Company headquartered at CBD Belapur in Navi Mumbai that operates Konkan Railway. The company started its full operations of trains on 26 January 1998.



The first passenger train which ran on Konkan railway tracks on 20 March 1993 between Udupi and Mangalore.Konkan Railway Corporation is at the forefront of research and development of new technologies and concepts for Indian railways. 

 During its initial years of operations in the mountainous Konkan region, a spate of accidents prompted Konkan Railway to investigate new technologies. The anti-collision devices, the Sky Bus and RORO are a few of the innovations from Konkan Railways. 


 Konkan Railway Recruitment 2018


Name  of Posts: Trackman, Assistant Pointsman, and Khalasi( 100 Posts)



Educational qualification: passed the class 10th exam from a recognized board of education.

Age limit: 18 to 33 years

Last date to apply: September 16, 2018

More details and official notification, Please click link below :

http://www.konkanrailway.com/pages/viewpage/current_notifications

B A N G A L O R E M E T R O R A I L C O RP O R A T IO N L IMI T ED (BMRCL) Jobs - Assistant Engineer, Assistant Executive Engineer for B.Tech/B.E, Diploma Holders



Namma Metro, also known as Bangalore Metro is a metro system serving the city of Bangalore, India. It is currently the second longest operational metro network in India after the Delhi Metro.On the other hand, Namma Metro was ranked the 83rd largest metro system in terms of length and the 79th largest metro network in terms of number of operating stations in the world. It also contains the first underground metro line in South India.



 The metro network consists of two colour-coded lines, with a total length of 42.3 kilometres serving 41 stations. The system has a mix of underground, at-grade, and elevated stations using standard-gauge tracks. The metro has an average daily ridership of 315,000 passengers. By 2021, the system is expected to complete its phase 2 network and provide connectivity to the city's important tech hubs of Electronics City and White Field


 
The Bengaluru Metro Rail Corporation Ltd (BMRCL), a joint venture of the Government of India and the Government of Karnataka, built and operates the Namma Metro.Services operate daily between 05:00 and 23:00 running with a headway varying between 4–20 minutes. The trains are composed of three cars. The power output is supplied by 750 volt direct current through third rail. Namma Metro was the second rail transport system in India to use 750V DC third rail traction, the first being the Kolkata Metro. 



BMRCL RECRUITMENT

Name of Post :  Assistant Engineer (68 Posts)

Qualification :  BE/ B.Tech in Civil Engineering or Diploma in Civil Engineering with 5- 8 years Experience.

Salary : Rs. 48,280/- Per Month

Location : Bangalore 

Last date : 31/08/2018



Name of Post : Assistant Executive Engineer ( 31 Posts)

Qualification: BE/ B.Tech in Civil Engineering with 8 -10 years experience 

Salary : Rs. 55,860/- Per Month

Location : Bangalore

Last date : 31/08/2018

More details and official notification, Please click link below:
http://english.bmrc.co.in/FileUploads/17ccba_CareerFiles.pdf       

MUMBAI METRO RAIL CORPORATION LIMITED RECRUITMENT FOR VARIOUS JOBS




Mumbai Metro is a rapid transit system serving the city of Mumbai, Maharashtra, and the wider MMR urban agglomeration. The system is designed to reduce traffic congestion in the city, and supplement the overcrowded Mumbai Suburban Railway (colloquially called local trains) network. It is being built in three phases over a 15-year period, with overall completion expected in 2025. When completed, the core system will comprise eight high-capacity metro railway lines, spanning a total of 235 kilometres (146 mi) (24% underground, the rest elevated, with a minuscule portion built at-grade), and serviced by 200 stations. 



Line 1 of the Mumbai Metro system is operated by Metro One Operation Private Limited (MOOPL), a joint venture company formed between RATP Dev Transdev Asia (a 50:50 RATP Développement and Transdev joint venture) (70%) and Reliance Infrastructure (30%). While lines 2, 7 (under construction) and 4 (bidding in progress) will be built by MMRDA, the completely underground line 3 (also under construction) will be built by Mumbai Metro Railway Corporation Limited (MMRCL). The total financial outlay for the expansion of the metro system beyond the currently operational Line 1 is 821.72 billion (US$12.25 billion or €10.46 billion), to be funded through a mix of equity and bilateral, multilateral as well as syndicated debt.


 
In June 2006, Prime Minister Manmohan Singh laid the foundation stone for the first phase of the Mumbai Metro project, although construction work began in February 2008.A successful trial run was conducted in May 2013, and the system's first line entered into operation on 8 June 2014. Many metro projects were being delayed because opposition by political parties, late environmental clearances and land acquisition troubles. The proposed 15 km line would link Kalyan and Sheel Phata with 13 stations, bring metro connectivity to Kalyan East, Dombivili, Ambernath and Div.



 MUMBAI METRO RAIL CORPORATION LIMITED   RECRUITMENT

Mumbai Metro Rail Corporation Limited intends to appoint qualified and experiencedprofessionals for the following posts on Deputation / Contract basis: 

Name Of Post : Junior Engineer II (5 Posts)

Qualification : Degree/ Diploma in Mechanical Engineering / Electrical Engineering /Civil Engineering from recognized and reputed university.
 
Name Of Post :Deputy Engineer (2 Posts)

Qualification :Degree in Civil Engineering from a recognized and reputed university.

Name Of Post : Executive Assistant To Managing Director(2 Post)

Qualification :Degree in Electrical/ Electronics/ Telecom/ Civil/ Mechanical Engineering from recognised and reputed university with MBA in HR / Personnel Management / PMIR/ IRPM.



 Name of Posts :Assistant to Executive Director,Accounts Officer,Senior Assistant ,Driver 

Last Date: 10/08/2018

How to Apply : Apply online only through MMRCL official website: www.mmrcl.com

More Details and Official notification,Please click link below:https://www.mmrcl.com/sites/default/files/MMRCL%20Advt.%202018-%2004.pdf